Event run sheet template UK: running order for Excel and Google Sheets

An event run sheet (also called a running order, day-of event schedule or production schedule) is the minute-by-minute plan everyone works from on the day — whether it is a wedding, conference, awards night, corporate Christmas party or kids' party. This UK guide covers how a wedding day timeline differs from a general event run sheet, which columns to track, how automatic start and end times work, pinning a fixed time, events past midnight, Key Contacts and Final Checks, and when to use Excel or Google Sheets. It is a planning method, not legal, tax or financial advice. Planning a wedding day in detail? Also see the wedding day timeline UK guide — the same Event Run Sheet & Running Order (£4.50) works for both.

What this guide is (and is not)

Wedding day timeline vs event / corporate run sheet

TopicWedding day timelineEvent / corporate run sheet
Typical fixed pointsCeremony, drinks, breakfast, speeches, first dance, carriagesDoors, registration, keynotes, breaks, awards, food, clear-down
Who owns each lineCouple's coordinator, venue, photographer, caterer, band/DJProducer, stage manager, AV tech, venue, caterer, speakers
Cue columnUseful for processional and first danceOften essential for AV, lighting and stage cues
Past midnightCommon for evening receptionsCommon for awards dinners and late parties
Same template?Yes — swap the lines; keep start, duration, end, what, where, lead, suppliers, cues and done

Both need one source of truth shared with the venue and suppliers before the day, and one person who owns last-minute changes on the day.

Columns matching an Event Run Sheet

Keep one sheet. Print or PDF it for the venue and suppliers so a late change only happens once.

ColumnWhy it matters
Event details (header)Date, venue, organiser and any hard finish / curfew in one place
Start timeWhen this item begins; can be typed over to pin a fixed time
DurationHow long it takes; changing it ripples later start and end times
End timeUsually calculated from start + duration
What happensThe action in plain language (doors open, keynote, awards set A)
WhereRoom, stage, foyer or outdoor area so suppliers know where to be
LeadThe person responsible for that line
SuppliersWho else is involved (AV, caterer, florist, registrar)
CuesWhat triggers the next action (music sting, lights down, slide change)
Done tickMark complete on the day so nothing is double-handled

How automatic times work

Enter a duration for each line. Start and end times then ripple through the sheet so a 10-minute overrun on speeches pushes everything after it — or you fix the next hard start and absorb the slip in a buffer line. Method:

  1. List every item in order, with a realistic duration (include changeovers and buffers as their own lines).
  2. Set the first start time (doors, registration or ceremony).
  3. Let end = start + duration, and the next start = previous end, unless you pin it.
  4. When something overruns on the day, update the duration (or insert a buffer) and re-share the sheet if suppliers need the new times.

Pinning a fixed start time

Some moments cannot move: a 2pm ceremony, a live broadcast, a guest of honour's arrival, or a venue's hard curfew. Type over that start time to pin it. Lines before and after still use durations; the pin creates a break in the automatic ripple so earlier slips do not silently move the fixed point.

Events that run past midnight

Awards dinners, late wedding receptions and New Year parties often cross midnight. Keep times in 24-hour format (or clear am/pm labels) and let the sheet continue into the next calendar day rather than resetting to morning times by mistake. Mark the venue's last orders and clear-down as their own lines with leads and suppliers.

Key Contacts and Final Checks

Tracking supplier deposits and balances separately? See the supplier payment tracker UK guide. Building the budget first? Use the event budget spreadsheet UK or corporate event budget UK guides.

Variants: same columns, different lines

Illustrative sample rows (made-up)

The rows below are made-up examples to show the layout. They are not a recommended schedule or a typical event.

StartDurationEndWhatWhereLeadNotes
18:0030 min18:30Example — doors & registrationExample — foyerExample — hostExample — badges on table
18:3020 min18:50Example — welcome & keynoteExample — main hallExample — MCExample — pinned start; AV cue lights down
18:5040 min19:30Example — dinner serviceExample — main hallExample — catererExample — dietary list shared
23:4530 min00:15Example — last orders & clear-downExample — bar / hallExample — venueExample — past midnight

Excel vs Google Sheets

DIY vs ready template vs bundles

More: wedding day timeline UK · corporate event budget UK · event budget spreadsheet UK · Christmas party checklist UK · office Christmas party planning · supplier payment tracker UK · gala and corporate seating plan UK

Free tools for this

Frequently asked questions

What is an event run sheet?

A detailed day-of schedule listing each item with start time, duration, end time, what happens, where, who leads it, which suppliers are involved, cues and a done tick. A running order is the simpler list of what happens; the run sheet is the working version for the venue and suppliers.

How is an event run sheet different from a wedding day timeline?

The columns are the same. A wedding timeline uses ceremony-to-carriages lines; a conference or awards night uses registration, sessions, awards and clear-down. One template can cover both — swap the lines. Our wedding day timeline UK guide focuses on wedding fixed points; this guide covers general and corporate events.

What columns should an event run sheet have?

Event details, start, duration, end, what happens, where, lead, suppliers, cues and a done tick. Add Key Contacts (mobiles and arrival/leave times) and a Final Checks list with due dates counted back from the event.

How do automatic times work on a run sheet?

You enter how long each item takes; start and end times update along the sheet. Type over any start time to pin a fixed moment such as a 2pm ceremony or keynote. Put buffer lines before pinned starts so overruns have somewhere to go.

Can a run sheet handle events past midnight?

Yes. Keep clear 24-hour (or am/pm) labels and let times continue into the next calendar day for last orders and clear-down rather than resetting to morning times by mistake.

Is there an event run sheet template for Excel or Google Sheets?

Yes. You can build the columns in this guide yourself, or use our Event Run Sheet & Running Order — an Excel template that also works in Google Sheets after upload, with auto times, pinable starts, past midnight support, Key Contacts, Final Checks and A4 portrait print, in £ with UK dates.

Can I use the same run sheet for a wedding and a corporate event?

Yes. The Event Run Sheet & Running Order works for weddings, parties, awards nights and conferences. Overwrite the example UK wedding day with your own lines. For wedding-specific fixed points and buffer advice, also read the wedding day timeline UK guide.

Is the Event Run Sheet & Running Order legal or financial advice?

No. It is a fill-in Excel planning template. This guide is not legal, tax or financial advice. Always confirm times and access with your venue and suppliers.

Written with AI assistance and checked against GOV.UK guidance. General information, not financial, tax or legal advice.